Dip tube entry
The tube needs to enter the bottle correctly before the closure is tightened.
Pump and trigger bottles
Pump and trigger bottles usually need more handling detail than ordinary screw-cap packs. Dip tubes, tall closures and orientation can define the final route.
The tube needs to enter the bottle correctly before the closure is tightened.
Some finished packs need the trigger or pump facing a particular direction.
Taller closures can make the bottle less stable during capping.
Shortlist route
Use these checks to decide whether the project is a semi-automatic, compact or automatic inline capping route.
| Project signal | Likely route | Why it matters |
|---|---|---|
| Simple pump bottles | Pump capping route | Checks tube entry and cap start before tightening. |
| Trigger sprayer bottles | Trigger capping route | Orientation and handling are usually project-specific. |
| Mixed caps and pumps | Flexible project review | Samples confirm whether one machine setup is realistic. |
Related routes
FAQ
They often thread onto bottles, but the handling requirements are different.
Yes, but orientation and dip tube behaviour must be checked.
Bottle, pump or trigger samples, dip tube length, target orientation and output target.
Ready to shortlist?
Lancing UK will help identify whether you need a semi-automatic capper, compact capper, inline spindle capper or specialist cap feeding route.